Six hundred metres from the crossroads, the part of the area that does not yet exist is being decided. On 19 September 2026, the day the Meazza turns one hundred, the VAS Environmental Report shows for the first time the volumes that could take its place: a new stadium towards via Tesio, the demolition of most of the old one, and on the cleared site a district of offices, hotels and shops set in green space.
As everywhere on the site, a plan is written as a plan. The VAS images are volume simulations, made to assess the environmental impact. The architectural design by Foster + Partners and MANICA was presented on 29 October 2026, under the name Generali Stadium: those images too are renders, not a built stadium.
The design · 29 October 2026
Generali Stadium, as it was presented
On 29 October 2026, at the Castello Sforzesco, Milan and Inter present the Foster + Partners and MANICA design and the stadium’s name. Below is what the clubs’ statement declares and at least two outlets report in the same way. It is a design: works are given from 2028, after the approvals.
The renders belong to the two clubs and are not reproduced here: they can be seen in the official statement. The statement and the images, on inter.it.
From the satellite · today
The plan area, as it is now
The Meazza, the forecourts, the former trotting track and La Maura: what the plan intends to change, photographed beforehand. All maps.
The design · the images
The Generali Stadium, in the clubs’ images
Renders and drawings by Foster + Partners and MANICA released by Inter and Milan on 29 October 2026, three photographs of the model and photographs of the evening at the Castello Sforzesco. They are reproduced at low resolution, for documentation; each image has its record with author, provenance and trademark credits.
Plan and volumes
Lo stadio e l’area, in volume
Buildings in black, streets in white, green and sports grounds in the section colours: the plan is drawn from OpenStreetMap data, with building volumes where the height is recorded. The 3D button shows the volumes; drag to rotate.
The diagram
What goes where, afterwards
The new stadium moves west, towards via Tesio; on the Meazza site an «L» remains to the south-east and the new volumes rise. Orientation diagram, not to scale and not a design.
stadium Via Tesio Meazza site ↳ the retained «L» Patroclo tunnel, rebuilt Via San Giusto 600 m Via Novara The crossroads North ↑
The red bars are the hypothesised volumes, in height relative to each other: the tallest is the 17-storey block in the plan. Not to scale, not a design.
What disappears
Four things the plan removes
The figures
The plan’s figures, with the source alongside
All from the filed documents or from the press reporting them. Where a figure rests on a single source, the row says so.
Chart
Two figures, drawn
Left, the seats from 1926 to the new stadium. Right, how the plan area is divided. The figures are the same as in the table above and in A hundred years.
The seats
- 1926Opening35.000–40.000
- 1990After the third tierabout 85,700
- New stadiumFoster and Manica design71.500
The area, about 280,000 m²
Half as green space is fixed by the agreement; how it is laid out on the ground will be set by the implementation plan.
Diagram
From the sale to 2032, in seven steps
Steps taken and steps planned. Dates after 2026 are from the plan, not outcomes.
The process
From the sale to 2032, act by act
Appeals and investigation on the sale
The proceedings on the sale of the stadium, the TAR ruling of 6 October 2026 on the appeals and the investigation by the Milan Public Prosecutor’s Office, are in the «Pending proceedings» box of the Press review, with the positions of the parties and the sources.
From the crossroads
What changes at the crossroads
The plan concerns the area to the north, but it also reaches the crossroads: people going up to the stadium pass here, and the Patroclo tunnel is the work closest to traffic at the junction.
Video
The design, explained
How the new stadium is conceived next to today’s.
Designs compared
Four designs, from 2019 to today
Three proposals were presented and set aside; the fourth is the one in progress. The images are from the studios that produced them, credited beneath each. For the current design the official render is not yet published: in its place, the area seen from the satellite.
How Foster + Partners and Manica were chosen
In June 2025 Inter and Milan concluded an international selection: thirteen studios assessed, five shortlisted. The Foster + Partners and Manica pairing won. Manica was the studio Milan had already chosen for a possible stadium at San Donato; Foster and David Manica have worked together since the new Wembley, in London.
From the photo collection
The stadium and the area, in photographs
All records in the photo collection.
Where it continues
- One hundred years of the stadium that disappears, in A hundred years.
- Local news, day by day, in Press review.
- The two streets of the crossroads in The crossroads.
- Each source with its limits in Sources.
The two stadiums as volumes
The Meazza and the Generali Stadium, side by side
The Meazza with its eleven towers and the red roof girders of 1990; the Generali Stadium of the Foster + Partners and MANICA project with its continuous roof, west of the Meazza, on the plan area. The diagram turns by itself; drag it to turn it by hand.
Sources for this page
- OpenStreetMap contributorsPlan and volume data (buildings, streets, green areas, heights), ODbL licenceopenstreetmap.org/copyright
What this page rests on
Every fact is checked against at least two independent sources and, where one exists, the official source. Where they differ the primary source prevails; if there is none, the disputed detail is not written. The press review and the calendar are updated every day.
Whatever rests on a single source today stays out until it is corroborated. Community memories are published as memories, with the consent of those who tell them: Community. The criterion is set out in Method.